800-watt grid feed-in, up to 1,000-watt modules
The 800 watts in the name represent the grid feed-in limit: the inverter will not feed more than this into the home’s electrical system (800 VA). The two modules together have a power output of 840 to 1,000 Wp. Having a higher module power output than the grid feed-in limit is not a contradiction: the modules operate closer to this limit for longer periods in the morning, evening, and on overcast days.
Two or four modules
Two modules are sufficient if you have a base load running during the day, such as refrigerators, routers, or a home office. The 2,000-watt balcony solar system with four modules offers more surface area and higher output during off-peak hours. If you want to use the electricity in the evening, choose a set with a storage unit: the NOAH 2000 and NEXA 2000 each hold 2,048 Wh; all corresponding sets are listed under Balcony Solar Systems with Storage.
Where to install it
On the balcony railing, on the exterior wall, on a flat roof, or in the garden. The mounting bracket is not included in the set because it depends on the installation location; suitable brackets can be found under Balcony Solar System Mounting Brackets. The overview of balcony solar system subsidies shows which states and cities offer subsidies.
Frequently Asked Questions About the 800-Watt Balcony Solar System
How much space does a 800-watt balcony solar system require?
Two modules measuring approximately 1.76 × 1.13 m require about 2.3 m of railing or wall space side by side.
Can I add a battery later?
Individual storage units are listed under Storage for Balcony Solar Systems. Check the data sheets for both devices to see if one is compatible with your inverter.
Do I need to register the balcony solar system?
Yes, you must register it with the Federal Network Agency’s Market Master Data Register within one month of commissioning. This applies to Germany. In Austria, according to oesterreich.gv.at, a balcony solar system does not require a permit, but you must notify the grid operator two weeks before commissioning.